Monday, 15 October 2018

Microsoft Project Setting a Baseline





To set a baseline

Menu, Tools, Tracking, Set Baseline


To set the original baseline all the settings can be left as they are, and click ok.


Should a baseline need to be set at a different time, then consideration needs to be given as to whether the original baseline needs to be replaced or added to.

No comments:

Post a Comment